The “Torre de Huercal Overa” dates back to the 13th century: it was built by the Arabs when the Nazari kingdom reigned in the south of the Iberian Peninsula.

Its location was the border between Christians and Nazaris at a time when the Reconquest had progressed and the Arab kingdom was reduced to the small bastion of Andalusia

Situated on the edge of a cliff, the existing remains were part of a bigger fortress now disappeared. This raised enclave was part of a defensive belt since ancient times: in the surroundings there are archeological remains dating back to the bronze age.

The main aim of the project was to make the tower accessible, and encompassed the repair and restoration of the original building. The criteria followed were to preserve as much as possible of the original materials, removing modern elements and resurfacing the original mud wall and brick fabric. Give the archeological importance of the site, new additions are made as removable objects, placed directly onto the ground without foundations and made with contrasting materials with the ones the original structure was built. Instead of reconstructing, the project emphasizes the new additions and states the lost pieces.

The project tries to reuse the existing topography to minimize ground alteration, so the parking area is set at an existing plateau at the end of the access road. A monolithic cor-ten steel box is placed to house the information office. Like a shipping container, it is intended to show its removable, traveling nature.

From that point, a pedestrian path was traced with the help of the archaeologists. Together with the guidelines they provided, the topography of the site traced itself the path to follow. The chosen layout looks for a gentle slope and creating flat spaces to rest and look. The trail is paved with pre-casted concrete tiles. Stone like benches are set along the way, emerging like part of the mountain.

The main aim for the restoration of the existing structure was to preserve and repair the original materials, removing the additions and surfacing the original materials where possible. The mud walls were cleaned and consolidated. In those places where the original surface was too damaged, a new limestone mortar cover was applied following a geometrical pattern framing the original wall finish. Text description provided by the architects. 